My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-18_REVISION - M2005070
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005070
>
2017-04-18_REVISION - M2005070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:08:55 PM
Creation date
4/19/2017 12:31:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005070
IBM Index Class Name
Revision
Doc Date
4/18/2017
Doc Name
Adequacy Review Response
From
Colorado Backhoe Service
To
DRMS
Type & Sequence
CN2
Email Name
ERR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consent ALenda form M-2009-074 <br /> March 27, 2017 <br /> Pa(c 2 of 3 <br /> Corrective Actions: <br /> • Require the Operator to submit an interim financial warranty of$15,000.00 within 30 <br /> days of the mailing date of the Board Order to cover the reclamation costs associated <br /> with existing unapproved disturbances (determined by a $2,500.00 per acre average). <br /> • Require the Operator to file a conversion application to increase the size of the current <br /> 110c Reclamation Permit to include the affected lands outside of the approved permit <br /> boundary. The Operator shall file the conversion application within 90 days of the <br /> mailing date of the Board Order, with all material in an approvable form within 180 days <br /> of the mailing date of the Board Order. The conversion application shall include <br /> information regarding the importation of material for processing and/or backfilling. <br /> Civil Penalty: Pursuant to C.R.S. § 34-32.5-123(2) an operator who operates without a permit <br /> shall be subject to a civil penalty of not less than $1,000.00 per day, nor more than $5,000.00 per <br /> day for each day during which such violation occurs. In this case, there are 34 days of violation <br /> from the signature date of the RTB letter (March 23, 2017) to the April 26, 2017 Board Meeting; <br /> the Board may assess a civil penalty of$34,000.00 to $170,000.00. <br /> The Board will assess a civil penalty of$1,000.00 per day of violation for 34 days, for a civil <br /> penalty amount of$34,000.00 with all but $1,000.00 suspended if the Operator complies with the <br /> corrective actions. <br /> The portion of the civil penalty not suspended, $1,000.00, shall be due and payable within thirty <br /> (30) days of the effective date of the Board Order. If the Operator does not comply with the <br /> corrective actions set forth in the Order, then the suspended penalties, $33,000.00, shall be due <br /> and payable. Failure to submit any due and unpaid civil penalties shall result in immediate <br /> submittal of such penalties to State collections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.