Laserfiche WebLink
0 <br /> "HELD TO A HIGHER STANDARD" <br /> * Avg. push distance of overburden: 100 ft. --Avg. push distance of topsoil: 100 ft.—Length of <br /> High wall: 150 ft. —Max slope while mining: 1:1—Average Cu. Yds to be moved 27,500 CY+/- (2 <br /> acres' x 8' depth). <br /> Duran & Pearce Contractors (Operator) calculates the reclamation cost based off the Cost <br /> Summary Work/ Reclamation Cost Review: <br /> Based on Reclamation Cost Review: <br /> Site: Martin Pit 1-A Permit Action 2012 March Review Permit#: M1990140 <br /> 01a Remove refuse from site Demolish 8 HR $4,135.89 <br /> 02a Reduce pit walls to 4H:1V Dozer 20.91 HR $4,19.25 <br /> 03a Rip compacted access road/stockpile Ripper 1.01 HR $215.00 <br /> 04a Transport topsoil from stockpile Loader 20.18 HR $2,841.00 <br /> 05a Distribute Topsoil Dozer 5.77 HR $1,153.36 <br /> 06a Revegetate Revege 8 HR $2,700.68 <br /> 07a Mobilize 2.57 $2,648.01 <br /> TOTAL DIRECT COSTS: $17,873.19 <br /> INDIRECT COSTS: $3,346.49 <br /> TOTAL BOND AMOUNT: $21,220.00 <br /> Exhibit M — Other Permits and Licenses <br /> Colorado Division of Reclamation, Mining and Safety— Martin Pit 1-A, Permit M-1990-140 <br /> Colorado Department of Health—Air Pollution Control Division Emission Permit <br /> Permit No. 90MF499F <br /> Moffat County—Conditional Land Use Permit—Permit No. C-40-6 <br /> *Storm water Permit NOT required <br /> 10 <br />