|
LOCATION IN APPLICATION
<br />INFORMATION CATEGORY
<br />NARRATIVE
<br />MAPS
<br />2 03 4
<br />Identification of Interests
<br />Volumes 1, 12, and 15 Section 2 03
<br />Not Applicable
<br />2 03 5
<br />Compliance Information
<br />Exhibit 2
<br />Not Applicable
<br />2 03 6
<br />Rights of Entry and Operation Information
<br />Volumes 1, 12, and 15 Section 2 03 6
<br />Not Applicable
<br />2 03 7
<br />Relationship to Areas Designated Unsuitable for Mining
<br />Volumes 1, 12, and 15 Section 2 03 7
<br />Not Applicable
<br />2 03 8
<br />Permit Term Information
<br />Volumes 1, 12, and 15 Section 2 03 8
<br />Not Applicable
<br />2 03 9
<br />Personal Injury and Property Damage Information
<br />Volumes 1, 12, and 15 Section 2 03 9
<br />Not Applicable
<br />2 08 5
<br />Bonding Information
<br />Volumes 1, 12, and 15 Section 3 01,
<br />Exhibit 13A, Exhibit 138
<br />Not Applicable
<br />2 03 10
<br />Identification of Other Licenses and Permits
<br />Volumes 1, 12, and 15 Section 2 03 10
<br />Not Applicable
<br />2 03 12
<br />Newspaper Advertisement (Submit a copy of the proposed newspaper advertisement)
<br />Volumes 1, 12, and 15 Section 2 03 12
<br />Not Applicable
<br />2 04 3
<br />Site Description and Land Use Information
<br />Volumes 1, 12, and 15 Section 2 04 3
<br />*Land Use 2 04(2)(a)
<br />2 04 4
<br />Cultural and Historic Resource Information
<br />Volumes 1, 12, and 15 Section 2 04 4
<br />Map 16B
<br />2 04 5
<br />General Description of Hydrology and Geology
<br />Volumes 1, 12, and 15 Section 2 04 5
<br />*Geology, surface and ground water systems of the permit, adjacent and general area 2 04 5(1)
<br />2 04 6
<br />Geology Description
<br />Volumes 1, 12, and 15 Section 2 04 6
<br />*Geology of the permit area 2 04 6(1)(a) or 2 04 6(2)(a)
<br />2 04 7(1)
<br />Ground Water Information
<br />Volumes 1, 12, and 15 Section 2 04 7
<br />*Hydrology 2 04 7(4)
<br />2 04 7(2)
<br />Surface Water Information
<br />Volumes 1, 12, and 15 Secbon 2 04 7
<br />*Hydrology 2 04 7(4)
<br />2 04 7(3)
<br />Alternative Water Supply Information
<br />Exhibit 7 Item 5
<br />Not Applicable
<br />2 04 8
<br />Climatological Information
<br />Volumes 1, 12, and 15 Secbon 2 04 8
<br />Not Applicable
<br />2 04 9
<br />Soils Resource Information
<br />Volumes 1, 12, and 15 Secbon 2 04 9
<br />*Soils 2 04 9(1)(c)
<br />20410
<br />Vegetation Information
<br />Volumes 1, 12, and 15 Section 2 0410
<br />*Vegetation 2 04 10(1)
<br />2 04 11
<br />Fish and Wildlife Resources Information
<br />Volumes 1, 12, and 15 Section 2 04 11
<br />Maps 13, 13A, 13B Sheets 1-3,14, 14A, 15,15A, 15B Sheets 1-3
<br />2 04 12
<br />Prime Farmland Investigation
<br />Volumes 1, 12, and 15 Section 2 04 12
<br />Not Applicable
<br />2 05 2
<br />Operation Plan Estimated Area for Life of Operation
<br />Volumes 1, 12, and 15 Section 2 05
<br />Maps 23, 23A, and 23B
<br />2 05 3
<br />Operabon Plan Permit Area
<br />Volumes 1, 12, and 15 Section 2 05 3
<br />*Operation Plan 2 05 3
<br />2 05 3(1)
<br />Production Methods and Equipment
<br />Volume 1 Section 2 05 3, Volume 12
<br />Section 2 05 3(1), and Volume 15 Section
<br />20531
<br />Not Applicable
<br />2 05 3(2)
<br />Operation Description
<br />Volume 1 Section 2 05 3, Volume 12
<br />Section 2 05 3(2), and Volume 15 Section
<br />20532
<br />Not Applicable
<br />2 05 3(3)
<br />Mine Facilities
<br />Volume 1 Section 2 05 3, Volume 12
<br />Section 2 05 3(3), and Volume 15 Section
<br />20533
<br />Maps 21, 22, 22A, and 228
<br />2 05 3(4)
<br />Ponds, Impoundments and Diversions
<br />Volume 1 Section 2 05 3, Volume 12
<br />Section 2 05 3(4), and Volume 15 Section
<br />20534
<br />Maps 10A, 10C, 11, 11A, 12, 12A, 12C
<br />2 05 3(5)
<br />Topsoil (removal and storage)
<br />Volumes 1 Section 2 05 3, Volume 12
<br />Section 2 05 3(5), and Volume 15 Section
<br />20535
<br />Maps 28, 28A, 28B, and 28C Sheets 1 and 2
<br />2 05 3(6)
<br />Overburden
<br />Volume 1 Section 2 05 3, Volume 12
<br />Section 2 05 3(6), and Volume 15 Section
<br />20536
<br />Not Applicable
<br />2 05 3(7)
<br />Coal Handling Structures
<br />Volume 1 Section 2 05 3, Volume 12
<br />Section 2 05 3(7), and Volume 15 Section
<br />20537
<br />Maps 21, 22, and 22B
<br />2 05 3(8)
<br />Coal Processing Waste and Non -Coal Processing Waste
<br />Volume 1 Section 2 05 3, Volume 12
<br />Section 2 05 3(8), and Volume 15 Section
<br />20538
<br />Not Applicable
<br />2 05 3(9)
<br />Return of Coal Processing Waste to Abandoned Workings
<br />Volume 1 Section 2 05 3, Volume 12
<br />Section 2 05 3(9), and Volume 15 Section
<br />20539
<br />Not Applicable
<br />2 05 4
<br />Reclamation Plan
<br />Volume 1, 12, and 15 Section 2 05 4
<br />Maps 19, 19A, 19B, 19C, 28, 28A, 28B, 29, 29A, 298, 44 and 46
<br />2 05 4(2)(a)
<br />Timetables
<br />Volume 1 Section 2 05 4, Volume 12
<br />Section 2.05 4(2)(a), and 15 Section
<br />20542 a
<br />Maps 29, 29A, and 298
<br />2 05 4(2)(b)
<br />Reclamation Cost Estimates
<br />Volume 1, 12, and 15 Section 3, Exhibit
<br />13A, Exhibit 13B
<br />Maps 34A, 38, and 40
<br />2 05 4(2)(c)
<br />Backfilling and Grading
<br />Volumes 1 Section 2 05 4, Volume 12
<br />Section 2 05 4(2)(d), and Volume 15
<br />Section 2 05 4 2 e
<br />*Post -mining topography 2 05 4(2)(c)
<br />2 05 4(2)(d)
<br />Topsoil (Redistribution)
<br />Volumes 1 Section 2 05 4, Volume 12
<br />Section 2 05 4(2)(e), and Volume 15
<br />Secbon 2 05 4 2 e
<br />Maps 28, 28A, 288, and 28C Sheets 1 and 2
<br />2 05 4(2)(e)
<br />Revegetation
<br />Volumes 1, 12, and 15 Section 4 15
<br />Maps 44 and 46
<br />
|