My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-14_HYDROLOGY - C1996083
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996083
>
2017-04-14_HYDROLOGY - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 10:55:56 AM
Creation date
4/14/2017 10:51:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Hydrology
Doc Date
4/14/2017
Doc Name Note
Sediment Pond
Doc Name
Quarterly Sediment Pond/Impoundment Report
From
J.E. Stover & Associates, Inc.
To
DRMS
Annual Report Year
2017
Report Quarter_Month
1
Permit Index Doc Type
Sediment Pond Inspections
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Identification <br />)f Pond <br />r During Inspection: <br />[imate Water Level <br />ant (% remaining) <br />N (cfs) <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />uctural <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />purtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Other <br />ditional Comments <br />QUARTERLY POND INSPECTION REPORT <br />Bowie Resources LLC Quarter: First 2017 <br />Bowie No. 2 Mine - C-1996-083 Inspection Date: 03 -Mar -17 <br />B <br />C <br />D - Gob Pile <br />F - New Gob <br />J UTL East <br />K UTL West <br />Sediment <br />Sediment <br />Sediment <br />Sediment <br />Sediment <br />Sediment <br />5949 <br />5996 <br />5971 <br />5948 <br />5848 <br />Dry <br />70% <br />90% <br />90% <br />80% <br />95% <br />80% <br />0 <br />0 <br />1 0 <br />0 <br />0 <br />0 <br />roblem <br />Problem <br />Problem <br />Problem <br />Problem <br />Proble <br />es/No <br />Yes/No <br />Yes/No <br />Yds/No <br />Yes/No <br />Yes/N <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />�1�0000' <br />0 <br />Design depth measured from pond bottom to invert of emergency spillway: <br />Pond 8=10, C=10, D=10, J=10, K=3, F=10' TD <br />Pond Bottom Elevations B=5942, C=5990, D=5970, J=5846, F=5944, K=5819 <br />Pond B held about 7 feet of water <br />Pond C held about 6 feet of water. <br />Pond D contained a pool of water a foot below the primary spillway. <br />Pond J held about 2 -feet of water. <br />Pond K had a couple of shallow puddles of water. <br />Pond F held about 4 feet of water and sediment <br />There were no mud pits open at the end of the quarter. <br />)nd B should be cleaned this year. <br />sediment delta at the outlet of Ditch F4 should be cleaned out this summer <br />ime of Inspector: Tamme Bishop <br />43402 <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.