My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-14_HYDROLOGY - C1996083 (2)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996083
>
2017-04-14_HYDROLOGY - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 10:55:56 AM
Creation date
4/14/2017 9:52:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Hydrology
Doc Date
4/14/2017
Doc Name Note
Impoundment Report
Doc Name
Quarterly Sediment Pond/Impoundment Report
From
J.E. Stover & Associates, Inc.
To
DRMS
Annual Report Year
2017
Report Quarter_Month
1
Permit Index Doc Type
Sediment Pond Inspections
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CWDA No. 2 <br />#01349-0001 ]H[uddlrston Berry <br />04/11/17 ��1 lnilnmini&Tn inp LLC <br />Discussion of Inclinometer Monitoring <br />Some minor movement was observed in the data for BG05. However, the movement was in the <br />direction parallel to the face of the gob. In addition, the data profile was consistent with previous <br />data and may simply reflect a measurement error. In general, 1St Quarter 2017 monitoring data <br />does not provide any indication of instability in CWDA No. 2. <br />Vibrating Wire Piezometers <br />Between 2005 and 2012, a total of ten vibrating wire piezometers were installed in CWDA No. <br />2. However, several of the piezometers have been damaged or have otherwise ceased to <br />function. Currently, five of the piezometers are functional. <br />Monitoring of the functioning piezometers was completed by DOWL on March 10', 2017. The <br />attached monitoring report prepared by DOWL includes the piezometer monitoring data and the <br />data is summarized in the following table. <br />VWP ID <br />Initial Pore <br />Pressure <br />(psi) <br />12/14/16 Pore <br />Pressure <br />(psi) <br />03/10/17 Pore <br />Pressure <br />(psi) <br />Difference Since <br />Installation <br />(psi) <br />Difference <br />Since Last <br />Reading (psi) <br />VWP-05 <br />6.8 <br />2.0 <br />1.9 <br />-4.9 <br />-0.1 <br />VWP-06 <br />11.3 <br />13.6 <br />13.6 <br />+2.3 <br />0.0 <br />VWP-08 <br />1 8.2 <br />9.9 <br />9.8 <br />+1.6 <br />-0.1 <br />VWP-09 <br />1 2.8 <br />2.8 <br />2.9 <br />+0.1 <br />+0.1 <br />VWP-10 <br />1 -1.9 <br />-1.8 <br />-1.7 <br />+0.2 <br />+0.1 <br />Discussion of Vibrating Wire Piezometers <br />VWP-05 <br />VWP-05 was installed on August 3, 2005 near the toe of CWDA No. 2 adjacent to the access <br />road/bench. The pore pressures recorded at VWP-05 have shown some seasonal fluctuations; <br />however, the range of pore pressure changes is fairly small. In general, HBET does not believe <br />that the pore pressures in VWP-05 are cause for concern regarding stability of the gob pile. <br />VWP-06 <br />VWP-06 was installed on June 5, 2009 near the existing top of CWDA No. 2. The pore <br />pressures recorded at VWP-06 have fluctuated since installation. In general, the fluctuations <br />have been seasonal and reflect the level of coal mine waste placement activity on top of CWDA <br />No. 2. Although an increase was recorded in the 1St Quarter 2016, the pore pressures recorded in <br />VWP-06 decreased and then stabilized since then. In general, HBET does not believe that the <br />measured pore pressures are an indication of any instability in CWDA No. 2. <br />VWP-08 <br />VWP-08 was installed on June 5, 2009 at a slightly lower elevation than VWP-06. The pore <br />pressures recorded at VWP-08 have fluctuated since installation. However, the fluctuations have <br />generally been within a narrow range of values. The measured pore pressures are generally <br />consistent with the level of coal mine waste placement activity at CWDA No. 2. <br />As indicated in the referenced Stability Evaluation report, the stability of CWDA No. 2 is <br />sensitive to increases in pore pressures in VWP-08. An increase in the pore pressure of 7 psi in <br />VWP-08 would result in a reduction of the Factor of Safety to below 1.5. <br />X:\2008 ALL PROJECTS\01349 -Bowie Resources, LLC\01349-0001 Bowie Mine\200 - Geo\Gob 2\Instrumentation Monitoring\2017\01349-0001 GP2 1stQ 2017 L041117.doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.