My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-13_HYDROLOGY - M1999051
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999051
>
2017-04-13_HYDROLOGY - M1999051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2020 11:27:32 PM
Creation date
4/14/2017 8:07:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999051
IBM Index Class Name
Hydrology
Doc Date
4/13/2017
Doc Name Note
Appliction to add solution mining injection well
Doc Name
Application to add solution mining injection well
From
Daub & Associates, Inc.
To
DRMS
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 600 <br /> 4031-1-1 Injection Well Drilling and Completion Information <br /> 700 <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: drill 24.0" conductor hole li <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: install 13.375" OD x 12.715" ID conductor casing (J-55, 48.0 Ib/ft), cement to surface <br /> I800 <br /> 132.8'-1466.4' MD KB; 120.0'-1453.6' MD GL: directional drill 9.50" vertical intermediate hole to KOP <br /> 1466.4'-2294.5' MD KB; 1453.6'-2281.7' MD GL: directional drill 9.50" curve portion intermediate hole, average 10.9° per 100 ft <br /> East 0.0'-2294.5' MD KB; 0.0'-2281.7' MD GL: install 7.0" OD x 6.366" ID intermediate casing (J-55, 23.0 Ib/ft), Centek centralizers every 80-100 ft West I'o0'`' <br /> i <br /> 0.0'-2294.5' MD KB; 0.0'-2281.7' MD GL: cement intermediate casing, Portland Type 1/II <br /> 2294.5'-5240.3' MD KB; 2281.7'-5227.5' MD GL: approximate length; directional drill 6.125" horizontal hole, maintain drill path 1' above base of UBB 1000 <br /> Production Casing (using packer) <br /> 0.0'-2083.1' MD KB; 0.0'-2070.3' MD GL: install 4.5" x 4.0" ID production casing (J-55, 11.4 Ib/ft); install annular packer at 2070.3 MD GL (DS) 1100 <br /> 2083.1'-5240.3' MD KB; 2070.3'-5227.5' MD GL: install 4.5"x 4.0" ID FJ production casing (J-55, 11.4 lb/ft) to TD <br /> KB: 6712.8',est <br /> Production Casing (using hanger) GL: 6700.0', est , Measured <br /> lzoo Depth GL <br /> 2083.1'-5240.3' MD KB; 2070.3'-5227.5' MD GL: install 4.5" x 4.0" ID FJ production casing (J-55, 11.4 Ib/ft); install hanger at 2070.3 MD GL (DS) <br /> Plug and Abandon, Option 1 <br /> 2108.1 MD KB; 2095.3 MD GL: set 4.5" Cast Iron Bridge Plug (CIBP) <br /> Kick-Off Point 1300 <br /> 1466.4 MD KB <br /> 0.0'-2078.1' MD KB; 0.0'-2065.3' MD GL: cut and remove 4.5" production casing 1453.E MD GL <br /> 0.0'-2108.1' MD KB; 0.0'-2095.3' MD GL: cement plug to surface laoo <br /> Intermediate Hole Drill Path <br /> 9.50"dia., 10.9°/100'Build Rate <br /> 132.8-2294.5 MD KB 1500 <br /> Production Casing (using packer) 120.0-2281.7 MD GL <br /> 4.5"OD x 4.0" ID, J-55 TD in Lower UBB <br /> i <br /> 0.0-2083.1 MD KB 7.0"x 4.5"Annular Packer <br /> r <br /> l <br /> 0.0-2070.3 MD GL <br /> 4.5"OD x 4.0" ID, J-55, FJ Steel or 7.0"x 4.5"Heavy Duty Casing Hanger <br /> 2083.1-5240.3 MD KB Production Hole Drill Path -2083.1 MD KB <br /> 2070.3-5227.5 MD GL <br /> 6.125"dia. Directional Hole Intermediate Casing -2070.3 MD GL i <br /> 2294.5-5240.3 MD KB 7.0"OD x 6.366" ID; J-55, 23.0 Ib/ft Install at DS <br /> i <br /> 2281.7-5227.5 MD GL 6.241" Drfit; 7.875" Coupling OD �� ;'goo <br /> TD: 5240.3 MD KB, approx. Production Casing (using hanger) Maintain Drill Path 1'Above Base of UBB 0-2294.5 MD KB <br /> i <br /> 4.5"OD x 4.0" ID, J-55, FJ Steel 0-2281.7 MD GL <br /> TD: 5227.5 MD GL, approx. 2083.1-5240.3 MD KB <br /> Land Casing in Lower UBB j , <br /> 2070.3-5227.5 MD GL � �0 <br /> Projected 403H-R Pass-by <br /> 2446.9 MD KB <br /> 2434.1 MD GL '90o P&A <br /> Cement Plug to Surface <br /> _I 'll III I I [ � P&A <br /> 0 <br /> Cut and Remove 4.5"Production Casing <br /> NO OD O co V U1O W N to N W N 0O <br /> 0.0-2065.3 MD GL <br /> O O O O O O O O O O O O O P&A <br /> O o O O O O O O o o O o O o O CD o $ Cast Iron Bridge Plug(CIBP) <br /> 2095.3 MD GL <br /> Natural Soda LLC <br /> 4031-1-1 Well Prognosis PA Schematic - Option 1 <br /> Section 25, T1S, R98W Rio Blanco County, CO <br /> Daub&Associates,Inc.,��1 <br /> ., _. i Date: March 8,2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.