My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-12_REVISION - M1977193
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977193
>
2017-04-12_REVISION - M1977193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:29:19 PM
Creation date
4/14/2017 8:06:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977193
IBM Index Class Name
REVISION
Doc Date
4/12/2017
Doc Name
Request for Technical Revision
From
Azurite, Inc.
To
DRMS
Type & Sequence
TR9
Email Name
TC1
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Timetable <br /> Construction of the fines stockpile will begin in 2017. At current average fines <br /> production rate, it will take seven years to produce the volume of the fines stockpile <br /> structure at 100% build out. However, the construction of the fines stockpile will be a <br /> dynamic process depending upon the sales of the fines for fill and sub-base compacted <br /> base material. In addition,the development of additional uses for the fines materials may <br /> change the actual timetable for stockpile capping and completion via re-vegetation. <br /> Stockpile Start Date May 2017 <br /> Completion Date Estimate May 2024 <br /> Reclamation Cost Estimates <br /> The present bond on the highwall portions of the property, which this structure will <br /> essentially backfill, is several times per acre compared to the cost of transporting and <br /> grading a planting medium at 12"depth, contour furrowing, seeding, and mulching. The <br /> following are some pertinent facts to the site: <br /> Volume (per acre)of planting medium to be applied: <br /> 12" equates to 43560 x I I0#/cu.ft. /2000#/ton=2396 tons per acre <br /> These materials are located 500'or less north of the proposed stockpile location. They <br /> will be transported to final location via haul truck at expected production rate of 350 TPH <br /> estimated machine cost per acre to transport planting medium................ $2000.00 <br /> estimated cost/ac to finish grade, install contour furrows with dozer......... $350.00 <br /> estimated cost/ac to purchase seed mix per approved site mixture............ $280.00 <br /> estimated cost/ac to purchase mulch 40 each 50#bales (2000#/acre) ......... $240.00 <br /> estimated cost/ac of labor to install seed and mulch.............................. $600.00 <br /> Total Cost per acre to cap, grade, furrow, seed, mulch.............................. $3470.00 <br /> This estimate is less than one fourth of the highwall derived bond calculation in place for <br /> the highwall zone acreage. For this reason, it is requested that no change in the overall <br /> bond in place is required to implement this technical revision. <br /> incerely, <br /> S <br /> Kenneth S. K co <br /> Consulting Geologist <br /> Azurite, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.