My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-03_REVISION - M1995007
>
Day Forward
>
Revision
>
Minerals
>
M1995007
>
2017-04-03_REVISION - M1995007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:14 PM
Creation date
4/13/2017 10:26:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995007
IBM Index Class Name
Revision
Doc Date
4/3/2017
Doc Name
Request for Technical Revision
From
Bent County
To
DRMS
Type & Sequence
TR2
Email Name
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />: < * COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY187 �� <br />• � 1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866-3567 CE, <br />File No.: M - <br />County, <br />REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET p1 APR 0 3 ?017 <br />1995-007 Site Name: ThomeCzek Pit <br />Bent County <br />Permittee: Bent County <br />Operator (If Other than Permittee): <br />Permittee Representative: Calvin Feik <br />VISloN <br />N fiR� L4 <br />MrN� SAPS TION <br />TR# DRMS Use only) <br />Please provide a brief description of the proposed revision: <br />Request permission to backfill using inert material generated outside of the approved permit area. Reclamation <br />has started but sufficient material may not be available on site. All new materials to be used will be clean and inert <br />as defined in Rule 1,1(20). Up to 15,000 cubic yards of material may be used to reduce the remaining open area of <br />the pit upon reclamation completion. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />I l Oc, l 11, 112 construction ❑ <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 ❑ <br />110d, 112d(l, 2 or 3) $1006 ❑ <br />TR02 <br />X Inadequate 2016 Annual Report! <br />✓2 Violations: <br />MV <br />-2013-022 <br />MV -2015-026 <br />M <br />Please provide a brief description of the proposed revision: <br />Request permission to backfill using inert material generated outside of the approved permit area. Reclamation <br />has started but sufficient material may not be available on site. All new materials to be used will be clean and inert <br />as defined in Rule 1,1(20). Up to 15,000 cubic yards of material may be used to reduce the remaining open area of <br />the pit upon reclamation completion. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />I l Oc, l 11, 112 construction ❑ <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 ❑ <br />110d, 112d(l, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.