Laserfiche WebLink
Boulay Report associated with Fontanari's delivery of water to the Carey Pond and the <br />"extension." The seven commitments include the following: <br />(1) Snowcap commits to conducting an investigation to determine the extent of <br />the hydrologic communication existing between the underground workings of the <br />Roadside Mine and the properties overlying these workings that belong to Mr. <br />Rudolph Fontanari and Mr. Jason Carey. Snowcap will inform the Division of the <br />dates that the on-site investigation will occur and the Division may attend. On or <br />before April 29, 2016, Snowcap will provide a copy of the final investigation <br />report to the Division. <br />(2) Snowcap commits to preparing a plan for the repair of this hydrologic <br />communication. <br />(3) Snowcap commits to developing a reclamation plan for any surface <br />disturbances that may occur in conjunction with the implementation of the <br />hydrologic communication repair plan. <br />(4) Snowcap commits to develop a cost estimate for the repairs and for the surface <br />disturbances associated with the repairs. <br />(5) On or before October 1, 2016, Snowcap commits to submitting a Technical <br />Revision to the Roadside Mine permit requesting approval of the hydrologic <br />communication repair plan, the reclamation plan, and the cost estimate for the <br />repair plan and the reclamation plan. <br />(6) Snowcap commits to repairing the hydrologic communication, and to <br />reclaiming surface disturbances that may occur in conjunction with repairing the <br />hydrologic communication. <br />(7) Snowcap agrees that the Division will retain reclamation bond dollars <br />associated with approval of Bond Release Application SL -08 until the Permit's <br />bond amount is adjusted during the Division's review of the Technical Revision <br />submitted pursuant to Item 5. <br />12. Notice of a complete application for MR -82 was made on December 17, 2015, in <br />accordance with 2 CCR 407-2:2.08.4(6)(c). No objections were filed. DRMS <br />subsequently approved MR -82. <br />13. In accordance with MR -82, SCC conducted an investigation to determine the extent of <br />the known hydrologic communication into the mine workings that was initially <br />documented by the Boulay Report and submitted those results on April 28, 2016 (the <br />"Initial Investigation Report"). <br />0 <br />