Laserfiche WebLink
March 30, 2017 C-1981-019/Colowyo Coal Mine ZTT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 4 of 7 <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br />The mine was actively mining within the South Tay lor Pit during the inspection. The drag line was in operation <br />and was along the southern end of the pit. <br /> <br />South Taylor Pit looking southeast. South Taylor Pit looking southwest. <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />Seasonal road ditch mateniance was being performed along the entrance to the mine just past the security office. <br /> <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />The 2015 and 2016 West Pit reclamation parcels were inspected. There w ere no visable signs of major erosion <br />along the slopes. <br /> <br />The reclaimed access road for the electrical pole repair work is seeing noticeable vegetative growth along the area. <br />No signs of erosion was present in the area.