Laserfiche WebLink
2 <br /> <br />New Horizon North TR15 ADQ Prepared by: R. Reilley <br />Date: April 2017 <br /> <br /> <br />As long as the post mining topography is approved the associated hydrology, watershed areas, ponds and culverts <br />appear adequately designed. Should there be changes to post mining topography then the above items and topics <br />require revisiting. <br /> <br /> <br />2.05.3(3) Culverts, Ponds <br /> <br />Culverts designed to safely pass the 1 year 24 hour precipitation event. DRMS notes reductions in sediment load <br />to ponds 003 and 001 in SedCad runs. <br /> <br /> <br />DRMS has no adequacy questions <br /> <br />