Laserfiche WebLink
EXHIBIT D -Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E-Map. <br /> 1) Primary future(Post-mining) land use(check one): <br /> F Cropland (CR) F-1 Pastureland (PL) General Agriculture (GA) <br /> Rangeland(RL) F-1 Forestry (FR) Wildlife Habitat(WL) <br /> F Residential (RS) F� Recreation (RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> Processed gravels will be placed into back into excavated cuts. Stockpiled topsoil will be spread ontop <br /> of the reclaimed processed material. Grading will then take place to existing contours and then will be <br /> cPPdPd with native graccec_The mineahle land citc nn an alluvial plane- nearlVperfectly flat_ <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 3 H: 1 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: IV (example 1 H:1 V, 2H: IV, etc.),please <br /> include a justification: <br /> Any slopes will be reclaimed to a 3/1 ratio. <br /> a. Please provide a general description of the backfilling and grading: <br /> Stockpiled topsoil will be spread ontop of the reclaimed processed gravels. Grading will then take <br /> plarP to Pxicting rnntmirc_ Grading will hp nutcnurrPd with Incal rnntrartorc_ <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches F-1 6-8 inches <br /> 8-10 inches _F,7� 10-12 inches <br /> Other: <br /> N/A, explain: <br />