Laserfiche WebLink
EXHIBIT C -Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: May 1, 2017 and completion: Nov 1, 2018 <br /> 2) How many years is the mine anticipated to be operational: 1.5 years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> ([]) all-yearlong or(_Eb seasonally, explain: May 1 - November 1 <br /> 4) How many aces of the mine site will be disturbed at any given time: 1 acres <br /> 5) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br /> F 4-6 inches =6-8 inches <br /> 8-10inches _EI_10-12inches <br /> Other: <br /> N/A, explain: Topsoil not immediately reclaimed to be covered w. erosion control blankets <br /> 6) Will you need to move any overburden (check one): (=)Yes or No <br /> a. If yes,approximately how thick is the overburden? feet <br /> 7) How will the mine be accessed: (]a) existing roads (=) new roads will be created <br /> Please describe the existing roads: <br /> .A.Mid maintained hAaffat Cownty Road 88 leads,to the site.The— ra;id into mons <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> Nn <br /> 8) Will water be needed during the mining operation (check one): (E✓ )Yes or(-a)No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> A permitted well was drilled in September 2016. Project will use 12.5 acre feet for per annum.All water <br /> from the well be placed back into the aquifer. <br /> 9) Will any water diversions or impoundments be constructed (check one): (1a)Yes or(-a)No <br /> a. If yes, please describe the water diversions or impoundments: <br /> A dam feature from past working will be used as a pond. The dam is 120'x 100'60' wide and <br /> apprnx R' dppp_ Pond will he imlined <br /> 10)Will any chemicals be used during the mining process (check one): (-a)Yes or No <br /> a. If yes, please describe the chemical types and quantities to be utilized,chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />