Laserfiche WebLink
The timeline for completion of removal or reclamation of all rock material, including sample <br />location #4, is predicated on the ability for CC&V to purchase all affected lands. CC&V has <br />been engaged with this activity since December 2016 and assuming access is possible to all rock <br />material piles described in this correspondence, CC& Vproposes to remove or reclaim the piles <br />by December 31, 2017. <br />References: <br />de Wet, L., 2012. Acid Base Accounting of Mining Ore and Waste, Waterlab Ltd and NLA -SA, <br />Test & Measurement Conference. Retrieved from <br />http: 'iwww.nla.or ,.za/webfilesleonferences. 2012/Pre_sentations/Tuesday °/°204° o2OSeptember/T <br />204%20° o20The° o20use° o20of° o20su1Rhur° g20determination.o °20acid° °20base° °20accountint? <br />0}a20and° o20other° o20static° a20methods° °20to° o20accurately° o24predict° °20acid%20rock%20d <br />rainage.ndf , 44p. <br />Fey, D.L., 2003. Acid -Base Accounting; Assessing the Toxicity Potential of Mine -Waste Pile <br />Workshop; USGS; ASMR Annual Meeting. Retrieved from https: Ypubs.usgs.govlof/2003/ofr- <br />03-210o'Section508 `IX Acid-base_Accounting-508.ydf , 34p. <br />Should you require further information please do not hesitate to contact Erik Munroe at 719-689- <br />4156 or myself at (719) 689- 4055 or Meg.Burt a,newmont.com. <br />Sincerely, <br />Meg Burt <br />Senior Environmental Manager <br />Cripple Creek & Victor Gold Mining Co <br />