Laserfiche WebLink
FORREST MINING PROJECT <br />HARD ROCK 1 METAL MINING <br />LIMITED IMPACT OPERATION (110(2)) <br />RECLAMATION PERMIT APPLICATION <br />6.3.5 (2) EXHIBIT E - MINING PLAN MAP <br />CLAIM LINE BOUNDARY <br />SURFACE OWNER: U.S.D.A. FOREST SERVICE <br />4 - EXISTING DISTURBANCES r r <br />r! <br />G.p WITHIN PERMIT BOUNDARY rr <br />yJ` APPROX. 700 SO. FT. �! <br />� <br />�� <br />5 I4.] <br />+i <br />I3J <br />` O <br />SURFACE OWNER: U.S.D.A` FOREST SERVICE <br />' THE DIRECTION OF THE rrr <br />r MINERAL EXTRACTION ++ <br />rr WILL BE <br />v rt' SOUTHEASTTONORTHWEST <br />' t � <br />i <br />PERMIT BOUNDARY © <br />ALSO THE �• p�' <br />PROPOSED PIT BOUNDARY, TOPSOIL SOP <br />AND OVERBURDEN BOUNDARY <br />r, <br />rr <br />JyQQ... <br />O <br />rI ry <br />r � <br />r <br />r,r � <br />r. O� <br />+I y <br />i <br />BLM MONUMENT <br />SW CORNER r' 285 FEET 5J� + r 240 FEET <br />SECTI0N1,T12S,R71W 'r / .�.l.—.�.�•� �. <br />SURFACE RIGHTS BOUNDARY �f 4 SURFACE OWNER: KAREN KRAAS <br />SURFACE OWNER: U.S.D.A. FOREST SERVICE N <br />4 <br />NOTE• <br />SEE ATTACHED 8.3.5 (2) EXHIBIT E - DETAIL 1 <br />FOR THE PROPOSED PIT BOUNDARIES, <br />TOPSOIL AND OVERBURDEN STOCKPILES. <br />PREPARED BY: JEFFREY L. OTTEN COLO. PLS 33199 <br />- qlff� _k 64��~ 4. - /- - cl <br />REVISIONS <br />No. DESC.: DATE: <br />I1 <br />1 INCH = 500 FEET <br />NAD 83 <br />PREPARED APRIL 3, 2017 <br />APPLICANT. AMAZONITE MINING, LLC <br />PROJECT MINERAL RIGHTS OWNERS: <br />JEFFREYAND BETSY FORREST <br />1. CMC No. 255354 <br />STUDENT LOAN No. 1 <br />2. CMC No. 255355 <br />STUDENT LOAN No. 2 <br />3. CMC No. 272515 <br />RUFF -LODE No. 1 <br />4. CMC No. 274852 <br />MICK-MAN LODE No. 1 <br />