Laserfiche WebLink
Borehole Worksheet Cont'd <br />Task # TTT <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />0.903 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.793 <br />Blade type: <br />1.000 <br />Net correction: 0.3566 <br />Adjusted unit production: 499.24 LCY/hr <br />Adjusted fleet production: 499.24 LCY/hr <br />JOB TME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.431/LCY <br />Total job time: 8.62 Hours <br />Total job cost: $1,855 <br />(1 SHIFT/DA <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 92 of 123 <br />CIRCES Cost Estimating Software <br />