My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-15_PERMIT FILE - C1981035A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2017-03-15_PERMIT FILE - C1981035A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2017 9:25:14 AM
Creation date
4/5/2017 9:30:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
3/15/2017
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borehole Worksheet Cont'd Task # TTT Page 86 of 123 <br />COMPACTION WORK <br />Task description: King II -Compact fill on portal cuts/access rd/water tank pad <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 305 <br />Date: 2/11/2015 <br />User: SLB <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Abbreviation: None <br />Filename: C035-305 <br />Basic Machine: CAT 825H Horsepower: <br />Compactor Type: Soil - tamping foot Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />MATERIAL QUANTITIES <br />Loose volume: 22,821 LCY <br />Compacted volume: 17,116 CCY <br />Source of estimated volume: Tasks 302 and 303 <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />354 <br />1 per day <br />(CRG) <br />Shrinkage factor: 0.750 <br />Unadjusted hourly production = (W x S x L x Q/ P <br />7.34 <br />Utilization % <br />Ownership Cost/Hour: <br />$62.10 NA <br />Operating Cost/Hour: <br />$116.14 100 <br />Operator Cost/Hour: <br />$28.75 NA <br />Total Unit Cost/Hour: <br />$206.99 <br />Total Fleet Cost/Hour: <br />$206.99 <br />MATERIAL QUANTITIES <br />Loose volume: 22,821 LCY <br />Compacted volume: 17,116 CCY <br />Source of estimated volume: Tasks 302 and 303 <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />354 <br />1 per day <br />(CRG) <br />Shrinkage factor: 0.750 <br />Unadjusted hourly production = (W x S x L x Q/ P <br />7.34 <br />feet <br />5.00 <br />mph <br />10.00 <br />inches <br />16.3 <br />(5,280ft./12in./27cu.ft.) <br />5 <br />passes <br />1,196.42 <br />CCY/hour <br />Site Altitude: 7,300 feet <br />JOB TIME AND COST <br />Fleet size: 1 <br />Compactor(s) <br />Unit cost: $0.208 per CCY <br />Total job time: 17.24 Hours <br />Total job cost: $3,568 <br />CIRCES Cost Estimating Software <br />Source <br />Altitude Adj: <br />1.00 CAT HB <br />Job Efficiency: <br />0.83 (1 shift/day) <br />Net Correction: <br />0.8300 multiplier <br />Adjusted Hourly Unit Production: 993.03 CCY/Hour <br />Adjusted Hourly Fleet Production: 993.03 CCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Compactor(s) <br />Unit cost: $0.208 per CCY <br />Total job time: 17.24 Hours <br />Total job cost: $3,568 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.