Laserfiche WebLink
Borehole Worksheet Cont'd <br />n..I <br />Task # TTT Page 83 of 123 <br />Haul Time: 0.397 minutes <br />Seg # A <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res ]—TTo­ta—IResVelocity <br />N <br />(% <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />490.00 <br />-3.00 <br />5.00 <br />2.00 <br />2905 <br />0.204 <br />Return Time: 0.204 minutes <br />Total Truck Cycle Time: 3.309 minutes <br />Loading Tool unit <br />Production 504.90 LCY/Hour Adjusted for job efficiency: 419.06 LCY/Hour <br />Truck Unit Production <br />275.83 LCY/Hour Adjusted for job efficiency: 228.94 LCY/Hour <br />Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br />Adjusted hourly truck team production: 457.89 LCY/Hour <br />Adjusted single truck/loader team production: 419.06 LCY/Hour <br />Adjusted multiple truck/loader team production: 419.06 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.980 /LCY <br />Total job time: 50.64 Hours <br />Total job cost: $20,800 <br />CIRCES Cost Estimating Software <br />