Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: King II - Haul coal waste rock to King I waste pile <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 300 <br />Date: 2/11/2015 <br />User: SLB <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Generic 12-18 c , 6x4 <br />-Loader: CAT 938H <br />Support Equipment -Load Area: NA <br />-Dump Area: CAT 938H <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C035-300 <br />Shift basis: 1 ner day <br />1+....a D......b.7..--.-.. T'......i,/T—.4— 'P-.— C11T­t pn,n inTnent Mnintenanne Fnninment <br />Total work team cost/hour: $302.21 <br />MATERIAL QUANTITIES <br />Initial volume: 37 CCY Swell factor: 1.000 <br />Loose volume: 37 LCY <br />Source of estimated volume: Assume 100 sf x 10 ft <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 50,300 Pounds <br />Payload Capacity: 17.34 LCY <br />Truck Bed (volume) Basis: <br />Struck Volume: 12.00 LCY <br />Heaped Volume: 18.00 LCY <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$15.21 <br />$21.63 <br />NA <br />$21.63 <br />NA <br />NA <br />Operating cost/hour: <br />$66.59 <br />$38.09 <br />NA <br />$38.09 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$26.72 <br />$37.13 <br />NA <br />$37.13 <br />NA <br />NA <br />Unit Subtotals: <br />$108.51 <br />$96.85 <br />NA <br />$96.85 <br />NA <br />NA <br />Number of Units: <br />1 <br />1 <br />0 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$205.36 <br />Support: <br />$96.85 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $302.21 <br />MATERIAL QUANTITIES <br />Initial volume: 37 CCY Swell factor: 1.000 <br />Loose volume: 37 LCY <br />Source of estimated volume: Assume 100 sf x 10 ft <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 50,300 Pounds <br />Payload Capacity: 17.34 LCY <br />Truck Bed (volume) Basis: <br />Struck Volume: 12.00 LCY <br />Heaped Volume: 18.00 LCY <br />