Laserfiche WebLink
King Mines C1981035 Midterm Review No. 7 Page 68 of 123 <br />excavated pit, 12 in. thick - Max. <br />200 ft. push <br />rock dust storage silo footers <br />2x2 <br />Demo. and on-site disposal in <br />2.00 <br />LF <br />$15.72 <br />$31.44 <br />excavated pit, 1.5 ft. x 3 ft. - Max. <br />200 ft. push <br />Concrete retaining wall #2 <br />70x2x4 <br />Wall, block, demolition only, 12 <br />560.00 <br />SF <br />$2.12 <br />$1,187.20 <br />in. thick - Horizontal reinforcing <br />Exec. offices/Parts <br />15Ox6Ox34 <br />Bldg. (MN) demo./on-site disposal <br />306,000.00 <br />CF <br />$0.23 <br />$69,156.00 <br />warehouse/Bath house bldgs <br />in excavated pit - Max. 10,000 ft. <br />haul <br />offices/warehouse/bath house <br />150x60 <br />Demo. and on-site disposal in <br />9,000.00 <br />SF <br />$1.75 <br />$15,750.00 <br />slab <br />excavated pit, 6 in. thick - Max. <br />200 ft, push <br />offices/warehouse/bath house <br />1x4 <br />Demo. and on-site disposal in <br />420.00 <br />LF <br />$15.72 <br />$6,602.40 <br />footers <br />excavated pit, 1.5 ft. x 3 ft. - Max. <br />200 ft. push <br />Covered storage building <br />80x2Oxl8.5 <br />Bldg. (SN) demo./on-site disposal <br />29,600.00 <br />CF <br />$0.20 <br />$5,949.60 <br />in excavated pit -Max. 10,000 ft, <br />haul <br />storage building slab <br />80x26 <br />Demo. and on-site disposal in <br />2,080.00 <br />SF <br />$1.75 <br />$3,640.00 <br />excavated pit, 6 in. thick - Max. <br />200 ft. push <br />storage building footers <br />1x4 <br />Demo. and on-site disposal in <br />260.00 <br />LF <br />$15.72 <br />$4,087.20 <br />excavated pit, 1.5 ft. x 3 ft. - Max. <br />200 ft. push <br />Main septic system tank <br />4000 gal <br />Excavate and load tank onto trailer, <br />1.00 <br />EA <br />$556.50 <br />$556.50 <br />non -leaking - 3,000 gal. to 5,000 <br />al. <br />Fuel storage building and apron <br />45x25x20 <br />Bldg. (SN) demo./on-site disposal <br />22,500.00 <br />CF <br />$0.20 <br />$4,522.50 <br />in excavated pit -Max. 10,000 ft. <br />haul <br />fuel storage building slab <br />45x27 <br />Demo. and on-site disposal in <br />1,215.00 <br />SF <br />$2.33 <br />$2,830.95 <br />excavated pit, 8 in. thick - Max. <br />200 ft. push <br />fuel storage building footers <br />1x4 <br />Demo. and on-site disposal in <br />140.00 <br />LF <br />$15.72 <br />$2,200.80 <br />excavated pit, 1.5 ft. x 3 ft. - Max. <br />200 ft. push <br />Belt portal <br />15x20x10 <br />Bldg. (SN) demo./on-site disposal <br />3,000.00 <br />CF <br />$0.20 <br />$603.00 <br />in excavated pit - Max. 10,000 ft. <br />haul <br />belt portal footers <br />1x2 <br />Demo. and on-site disposal in <br />30.00 <br />LF <br />$6.99 <br />$209.70 <br />excavated pit, 1.0 ft. x 2 ft. - Max. <br />200 ft.push <br />Return portal <br />15x20x10 <br />Bldg. (SN)Aemo./on-site disposal <br />3,000.00 <br />CF <br />$0.20 <br />$603.00 <br />