Laserfiche WebLink
King Mines C1981035 Midterm Review No. 7 Page 64 of 123 <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />10560.00 <br />-11.50 <br />5.00 <br />-6.50 <br />2938 <br />3.705 <br />Loading Tool unit <br />Production 504.90 <br />Truck Unit Production <br />42.00 <br />Optimal No. of Trucks: 12 <br />Return Time: 3.705 <br />Total Truck Cycle Time: 21.727 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 209.18 <br />Adjusted single truck/loader team production: 209.18 <br />Adjusted multiple truck/loader team production: 209.18 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $4.038 /LCY <br />minutes <br />minutes <br />419.06 LCY/Hour <br />34.86 LCY/Hour <br />6 Truck(s) <br />LCY/Hour <br />_ LCY/Hour <br />LCY/Hour <br />Total job time: 30.85 Hours <br />Total job cost: $26,060 <br />