Laserfiche WebLink
King Mines C1981035 Midterm Review No. 7 Page 48 of 123 <br />Postmining Channel Construction Task No. 024 <br />11 -Feb - <br />Date : 15 Permit C1981035 Site: King Coal Mines <br />User: SLB State : Colorado County: La Plata <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit <br />Action: Permit Renewal 6 Task Description: Construct Post -Mining Drainage Channels <br />W <br />Slope Surf <br />Channel <br />L <br />D W (bot) <br />Slopes <br />(Top) <br />V/LF <br />V tot <br />Riprap <br />L Area <br />Riprap V <br />(ft) <br />(ft) (ft) <br />(X:1) <br />(ft) <br />(CY) <br />(CY) <br />(ft) (sf) <br />CY <br />A <br />100 <br />1.500 1.0 <br />2.0 <br />7.0 <br />0.2222 <br />22 <br />2.50 600 <br />0 <br />B <br />330 <br />1.500 2.0 <br />2.0 <br />8.0 <br />0.2778 <br />92 <br />4.27 3,480 <br />0 <br />C <br />350 <br />1.000 2.0 <br />2.0 <br />6.0 <br />0.1481 <br />52 <br />4.12 3,586 <br />0 <br />D <br />770 <br />1.000 1.0 <br />2.0 <br />5.0 <br />0.1111 <br />86 <br />2.24 4,214 <br />0 <br />E <br />190 <br />1.750 1.0 <br />2.0 <br />8.0 <br />0.2917 <br />55 <br />2.66 1,200 <br />38 <br />F <br />35 <br />1.750 1.0 <br />2.0 <br />8.0 <br />0.2917 <br />10 <br />2.66 221 <br />7 <br />Totals <br />1,775 <br />317 <br />13,300 <br />45 <br />Riprap <br />Materials Needed: <br />Geotextile (SY): <br />330 <br />(CY): <br />45.0000 <br />45 <br />Excavation (CY): <br />317 <br />Material <br />Costs: <br />Geotextile (SY): <br />$ 2.22 <br />Riprap (CY): <br />$53.25 <br />Excavation (CY): <br />$ 3.57 <br />Means Reference <br />33 46 26.10 0110 <br />3137 13.10 0100 <br />3123 16.42 0310 <br />Totals: <br />Geotextile (SY): <br />$ 732.60 <br />Riprap (CY): <br />$2,381.97 <br />Excavation (CY): <br />$ 1,131.41 <br />Hours: <br />Geotextile (SY): <br />3.77 <br />Riprap (CY): <br />5.77 <br />Excavation (CY): <br />9.39 <br />7.75 <br />33.75 <br />87.5 SY/HR <br />CY/HR <br />CY/HR <br />Total Post -Mining Channel Reconstruction hours: <br />18.93 <br />Total Post -Mining Channel Reconstruction Cost: <br />$ 4,245.98 <br />