My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-15_PERMIT FILE - C1981035A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2017-03-15_PERMIT FILE - C1981035A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2017 9:25:14 AM
Creation date
4/5/2017 9:30:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
3/15/2017
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
King Mines C1981035 Midterm Review No. 7 Page 20 of 123 <br />Spoil pile. <br />0.800 <br />(SSD -AC) <br />Push gradient: <br />1.115 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.793 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.5284 <br />Adjusted unit production: <br />Adjusted fleet production: <br />259.92 LCY/hr <br />259.92 LCY/hr <br />JOB TIME AND COST <br />Fleet size: <br />1 Dozer(s) <br />Unit cost: <br />$0.828/LCY <br />Total job time: <br />1.54 Hours <br />Total job cost: <br />$331 <br />
The URL can be used to link to this page
Your browser does not support the video tag.