Laserfiche WebLink
King Mines C1981035 Midterm Review No. 7 Page 12 of 123 <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res <br />Total Res <br />(% <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />500.00 <br />0.00 <br />5.00 <br />5.00 <br />2814 <br />0.203 <br />Loading Tool unit <br />Production 494.19 <br />Truck Unit Production <br />246.12 <br />Optimal No. of Trucks: 2 <br />Return Time: 0.203 <br />Total Truck Cycle Time: 2.781 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 408.55 <br />Adjusted single truck/loader team production: 408.55 <br />Adjusted multiple truck/loader team production: 408.55 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.609 /LCY <br />minutes <br />minutes <br />410.18 LCY/Hour <br />204.28 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 4.51 Hours <br />Total job cost: $1,122 <br />