My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-04_REVISION - M2017002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2017002
>
2017-04-04_REVISION - M2017002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:16 PM
Creation date
4/4/2017 2:44:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017002
IBM Index Class Name
Revision
Doc Date
4/4/2017
Doc Name
Request for Technical Revision
From
Ames Construction
To
DRMS
Type & Sequence
TR1
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No.: M - <br />County, <br />2 <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866-3567 ~'Chao <br />RE UEST FOR TECHNICAL REVISION TR COVER SH ET APR 0 4 2017 <br />017-002 Site Name: Ard Property Borrow M,rvrnr� 5lON 0)rRFS tA <br />Weld <br />TR# HRMS Use on1v) <br />Permittee: Ames Construction, Inc. <br />Operator (If Other than Permittee): T <br />Permittee Representative: Robert GIIIIS Complied! <br />'i0 ViolationsPlease provide a brief description of the proposed revision: _ <br />In response to 3/2/2017 inspection, submitting revision to update and clarify the approved <br />mine and reciamation-maps to reflect existing and proposed activities with respect to the <br />Noble Energy wellhead ARD 6-3,11. Submitting updated maps, 200' clear of Noble well. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. if the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Tvne Required TR Fee Submitted (mark only one) <br />110c, 111, 112 construction ❑ <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 ❑ <br />110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.