Laserfiche WebLink
Page 5 of 5 <br /> <br />Division records indicate the following permittee/landowner contact information (blank fields indicate that we do not have <br />information on record). If this information is blank or not current , please type or print current contact information: <br /> <br />Permittee Contact: <br /> <br />George Tempel <br />Permittee Company: <br /> <br />Midwestern Farms <br />Address: <br /> <br /> <br /> <br />P.O. Box 246 <br />Wiley, CO 81092 <br /> <br />Phone Number: <br /> <br />(719) 829-4408 <br />Fax Number: (719) 489-6915 <br />Email Address: <br />Permitting Contact: <br /> <br />Joe C. Baxter <br />Company: <br /> <br />Eastern Colorad Aggregates <br />Address: <br /> <br /> <br /> <br />P.O. Box 580 <br />Rye, CO 80169 <br /> <br />Phone Number: <br /> <br />(719) 489-3385 <br />Fax Number: (719) 489-2265 <br />Email Address: <br />Inspection Contact: <br /> <br />Joe C. Baxter <br />Company: <br /> <br />Eastern Colorado Aggregates <br />Address: <br /> <br /> <br /> <br /> <br />P. O. Box 580 <br />Rye, CO 81069 <br /> <br />Phone Number: <br /> <br />(719) 489-3385 <br />Fax Number: (719) 489-2265 <br />Email Address: <br /> <br />I, the undersigned, hereby state that the information provided in this report is true and accurate, and that site operations are <br />being conducted in accordance with the Division approved mining and reclamation plans. <br /> <br /> <br /> <br />Signature of Permittee, Corporate Officer, Owner, or Documented Designee Date <br />M-AF-01