Laserfiche WebLink
NEW ELIC COAL <br />COMPANY <br />April 2, 2017 <br />Rob Zuber <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Rm. 215 <br />Denver, Colorado 80203 <br />Re: New Elk Mine <br />2016 Annual Hydrology Letter Report <br />Dear Mr. Zuber: <br />The New Elk Mine Annual Hydrologic Monitoring Requirements are <br />summarized by Table 27 Hydrologic Monitoring Requirements—New <br />Elk Mine and Table 28 Water Quality Laboratory Analysis—New Elk <br />Mine attached to this letter report. Table 27 includes monitoring sites <br />(* *) that have been installed but not implemented as the <br />technical/permit revisions requiring them have either been withdrawn or <br />not implemented (bonded) at this time. <br />NPDES Discharge Monitoring <br />All NPDES discharges were monitored and reported CDPHE on <br />Discharge Monitoring Report forms (DMRs). Copies of these reports <br />have already been submitted to the Division (DRMS). <br />12250 Hwy 12 PHONE (719) 859-0111 <br />Weston, CO 81091 FAX 1 ((719)868-0044 <br />E-MAIL I ronthompson@newelkcoal.com <br />