My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-04_REVISION - M2009077
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009077
>
2017-04-04_REVISION - M2009077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:02:11 PM
Creation date
4/4/2017 12:01:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009077
IBM Index Class Name
REVISION
Doc Date
4/4/2017
Doc Name
Application
From
Tracy and Ed Grimes
To
DRMS
Type & Sequence
CN1
Email Name
PSH
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. The Board may suspend or revoke this permit,or assess a civil penalty,upon a finding that the permittee <br /> violated the terms or conditions of this permit,the Act,the Mineral Rules and Regulations,or that information <br /> contained in the application or your permit misrepresent important material facts; <br /> _ 3. if your mining and reclamation operations affect areas beyond the boundaries of an approved permit <br /> boundary,substantial civil penalties,to you as pennittee can result; <br /> 4. Any modification to the approved mining and reclamation plan from those described in your approved <br /> application requires you to submit a permit modification and obtain approval from the Board or Office, <br /> 5, it is your responsibility to notify the Office of any changes in your address or phone number, <br /> 6. Upon permit issuance and prior to beginning tin-site mining activity,you must post a sign at the entrance of <br /> the mine site,which shall be dearly viable from the access road,with the following information(Rule 3.1.12): <br /> a. the of the operator; <br /> b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br /> Reclamation Board;and, <br /> c. the permit number. <br /> 7. The boundaries of the permit boundary area must be marked by monuments or other markers that are clearly <br /> visible and adequate to delineate such boundaries prior to site disturbance. <br /> 8. It is a provision of this permit that the operations will be conducted in accordance with the terms and <br /> editions listed in your application,as well as with the provisions of the Act and the Construction Material Rules <br /> and Regulations in effect at the time the permit is issued <br /> Annually,on the anniversary date of permit issuance,you must submit an annual fee as.specified by Statute, <br /> and an annual report which includes a map describing the acreage affected and the acreage reclaimed to date(if <br /> tyre are changes from the previous year),any monitoring required by the Reclamation Plan to be submitted <br /> annually on the anniversary date of the permit approval.Annual fees are for the previous year a permit is held For <br /> example,a permit with the anniversary date of July 1,1995,the annual fee is for the period of July 1,1994 through <br /> June 30,1995. Failure to submit your annual fee and report by the permit anniversary date may result in a civil <br /> penalty,revocation of your permit,and forfeiture of your financial warranty. it is your responsibility,as the <br /> permittee,to continue to pay your annual fee to the office until the Board releases you from your total reclamation <br /> responsibility. <br /> -10. For joint venturelpaitn operators:the signing representative is authorized to sign this document and a <br /> power of attorney(provided by the partner(s))authorizing the signature of the representative is attached to this <br /> application. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.