My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-16_REVISION - M1977141
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977141
>
2017-03-16_REVISION - M1977141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:14 PM
Creation date
4/4/2017 11:01:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
Revision
Doc Date
3/16/2017
Doc Name
Adequacy Response No. 3
From
Aggregate Industries - WCR, Inc.
To
DRMS
Type & Sequence
TR2
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F)? <br /> 6.4.6 Exhibit F â Reclamation Plan Map <br /> 4. The Reclamation Plan Map which was submitted does not conform to the <br /> requirements of Rule 6.2.1(2) or Rule 6.4.6. Please revise the Reclamation <br /> Plan Map to contain the following: <br /> a. Show the name of the Operator. <br /> b. Must be prepared and signed by a registered land surveyor, <br /> professional engineer, or other qualified person. <br /> c. Identify and outline the permit boundary. <br /> d. The acceptable range of map scales shall not be larger than 1 <br /> inch = 50 feet, nor smaller than 1 inch = 660 feet. <br /> Response: <br /> Exhibit Fâ Reclamation Plan Map is revised to include the operator <br /> name and limits of affected land. The submitted final plan will be signed <br /> by a registered professional engineer. Map scales on the two sheets are <br /> 1 inch = 200 feet (1 inch = 400 feet printed at half size) and 1 inch = 100 <br /> feet (1 inch = 200 feet printed at half size). <br /> 6.4.12 Exhibit L â Reclamation Costs <br /> 5. The original reclamation cost estimate provided for the work proposed <br /> under Technical Revision No. 2 was revised from $9,602,780.00 to <br /> $9,097,008.00. The items under the reclamation cost estimate which were <br /> revised account for a percent of the base cost. Please explain the changes <br /> made to the reclamation cost estimate. <br /> Response: <br /> The original reclamation cost estimate showed the cost for Erosion, <br /> Sedimentation and Dust Control as 5 percent of the Total Cost. The <br /> original estimate also showed Site Drainage and Runoff Control as a <br /> separate item. The revised reclamation cost estimate shows these two <br /> items combined with a reduced cost of 1 percent of the Base Cost. This <br /> change was based on discussions with an earth work contractor. <br /> 6. The Reclamation Plan calls for 300 lbs. of nitrogen and 50 lbs. of <br /> phosphorus per acre for a total fertilizer application rate of 350 lbs. per <br /> hdrinc.com <br /> 1670 Broadway, Suite 3400, Denver, CO 80202-4824 <br /> (303)764-1520 <br />
The URL can be used to link to this page
Your browser does not support the video tag.