Laserfiche WebLink
Tab 14 <br /> RECLAMATION PLAN <br /> Rule Description Page <br /> 2.05.4(2) Reclamation Plan............................................................................................14-1 <br /> List of Tables <br /> 14-1 Reclamation Soils Balances&Areas <br /> 14-2 Stockpile Volumes&Redistribution <br /> 14-3 Temporary Seed Mixture <br /> 14-4 Permanent Seed Mixture <br /> 14-5 1999 Vegetation Sampling <br /> 14-6 Permanent Seed Mix for 2 West Portals and South Fan <br /> 14-7 RDRDA Borrow Area-Quantity Calculation <br /> 14-8 Permanent Seed Mixture-Lowland and Upland Components <br /> 14-9 Permanent Seed Mixture-North Decline, Fall 1992(Historical) <br /> 14-10 Permanent Seed Mixture-CRDA 2&3(Historical) <br /> 14-11 Permanent Seed Mixture-Ute Water Disturbance,2000(Historical) <br /> 14-12 Interseeding Seed Mixture-CRDA 2, November 2001 (Historical) <br /> 14-13 Permanent Seed Mixture-(Historical) <br /> 14-14 North Decline Interseeding <br /> 14-15 Salt Tolerant Seed Mix <br /> List of Figures <br /> 14-1 Reclamation Timetable <br /> 14-2 Permanent Mine Seal <br /> 14-3 Permanent Drill Hole Seal <br /> 14-4 Refuse Pile Animal Habitat <br /> 14-5 RSDA South End Rirrap Ditch <br /> 14-6 Roadside South Portal Mine Water Discharge System <br /> 14-7 Roadside South Portal Dewatering Schematic <br /> 14-8 Mine Dewatering -Plan and Profile <br /> 14-9 Roadside South Portal-Mine Inflow Rate Determination <br /> 14-10 North Decline Mine Discharge System-Flow Calculation <br /> 14-11 Siphon System-Flow Calculation without Siphon Influence <br /> 14-12 Debris Fin <br /> 14-13 Cameo Borrow Area No. 1 <br /> 14-14 Portal Highwall <br /> 14-15 Land Use Change Implementation Plan Timetable <br /> 14-16 Cap for 30" CMP <br /> 14-17 Repair Plan for South Portal Hydrologic Communication <br /> 14-18 Reclamation Schedule Hydrologic Communication Repair Plan <br /> List of Appendices <br /> 14-1 BLM-Proposal for Revegetation Research Project <br /> 14-2 Reclamation Plan Cost Estimate <br /> 14-3 Reclamation Costs,Cameo Refuse Disposal Areas No. 2 and other Areas <br /> 14-4 Other Reclamation Cost Estimates <br /> 14-5 Affected Land Owners Reclamation Approval <br /> 14-6 Final Reclamation Drainage Design <br /> 14-7 Revegetation Evaluation -Diversity <br /> 14-8 Slope Stability Analysis-Roadside South Portal <br /> 14-9 Approximate Original Contour Variance <br /> 14-10 Steep Rock Slope Retention <br /> 14-11 Re-Evaluation of Revegetation Success Standards—2010 <br /> 14-12 Soils Loss Comparison-South Portal&North Decline <br /> 14-13 Soils Loss Comparison-North Portal,CRDAs&CBAs <br /> TR-69 (Rev 12/16) <br />