Laserfiche WebLink
Snowcap Coal Company <br /> Figure 14-18 <br /> Hydrologic Communication Repair Plan <br /> Implementation and Reclamation Schedule <br /> Start Date Unknown Day <br /> Work Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 <br /> Mobilization&Demobilization <br /> Topsoil Salvage(325 cubicyards) <br /> Excavation(1,100 cubicyards) <br /> Inspection <br /> Pour Concrete Cap Over Shaft(15 cubic yards) <br /> Place and Compact Backfill(1,100 cubic yards) <br /> Replace Topsoil(325 cubic yards) <br /> Seed and Mulch <br /> TR-69 Figure 14-18 12/16 <br />