My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-29_PERMIT FILE - M2016085
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016085
>
2017-03-29_PERMIT FILE - M2016085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 8:10:48 AM
Creation date
4/3/2017 12:52:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016085
IBM Index Class Name
Permit File
Doc Date
3/29/2017
From
Bradley Windell & Heidi Hynes
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the mining activity and these many hundreds of acres of exposed sand and gravel create <br />harmful and fierce dust storms. <br />Recommendation; Require the applicant to identify a qualified Air Quality Engineering group with the <br />charge of developing background data and a monitoring plan prior to mining and for the life of the mine. <br />Immediately, begin a sixteen month background opacity study utilizing EPA Method 9 (40 CFR, Part 60 <br />Appendix A (July, 1992)) in all subsections of Section II, A and B of this regulation. Develop, maintain and <br />analyze a weekly record keeping compliance plan implemented by others. The purpose of the <br />compliance plan is to provide a consistent reasonable process for documenting air quality. The bi- <br />weekly onsite monitoring and sampling inspection and analysis is required to monitor the long term <br />exposures. Further, the development of an air quality violations protocol, notification of violation and <br />initiating enforcement actions to ensures that violations are addressed in a timely manner. Finally, have <br />the Air Quality Engineers develop trigger points that create discernible compensatory damages and a <br />long-term exposure compensation schedule for the affected adjacent landowners. <br />Necessary Mitigation: This land owners property is elevated 14 feet above the <br />proposed mine and is flanked by the mine for a quarter of a mile (1,468 If). To mitigate <br />these dangerous health condition this land owner requires that the applicant NCCI <br />employ; <br />L Mining sound and dust control walls that typically range in height from <br />16 to 32 feet must be installed on all four sides of a Mining Processing <br />Plant Area to prevent associated fugitive dust and control processing <br />noise. The ENC`s STC -25 modular acoustical and fugitive particulate <br />confinement wall panel system is specially designed to effectively block <br />related noise and fugitive particulate propagating into the surrounding <br />environment The wall units also allow for quick and efficient installation <br />and alteration. <br />ii. Chemical stabilization of unpaved roads as often as necessary to <br />minimize fugitive particulate matter, using polymer products (e.g., <br />polyvinyl acetates, vinyl acrylics) must be required and verifiable. <br />iii. Control of fugitive particulate emissions from aggregate storage pile <br />through the use of enclosures, covers, or stabling polymer product be <br />employed by the applicant. <br />iv. Minimize the area to be disturbed by mining and develop a strict mining <br />exposure plan that limits disturbed soils to be employed by the <br />applicant, <br />v. Require prompt removal of aggregates and prompt revegetation, <br />vi. Restrict and limit location of over burden stock piles to minimize <br />fugitive particulate emission by developing a strict staged mining plan, <br />vii. Require prompt revegetation, seeding and mulching and otherwise <br />stabilizing the exposed aggregate surfaces within the mine and the <br />
The URL can be used to link to this page
Your browser does not support the video tag.