My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-27_REVISION - M1981185 (33)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2017-03-27_REVISION - M1981185 (33)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:16:33 PM
Creation date
3/30/2017 8:15:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
3/27/2017
Doc Name Note
Exhibit L Reclamation Costs
Doc Name
Request For Amendment To Permit
From
Sunrise Mining, LLC
To
DRMS
Type & Sequence
AM2
Email Name
LJW
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R21NCORPORATED <br /> 1-NVIRONMI T AI ANI)I-NGIYPPklN(�SEk1 ICI <br /> ST RN TEGICALL) I'c)SI rioNED 1 E.CI 1NICALL) PREPARED <br /> MAY DAY IDAHO MINE COMPLEX <br /> 112(d)PERMIT <br /> EXHIBIT L <br /> Reclamation Costs <br /> Rule 6.4.12 <br /> 6.4.12 Reclamation Costs <br /> The following summarizes the key reclamation components of the affected lands including the following: <br /> • Operational Area; <br /> • Drainage Channel Reclamation; <br /> • La Plata River Bridge; (to remain after mining); <br /> • Roads <br /> o Pre-existing(to remain after mining); and <br /> o New Access Road(to remain after mining). <br /> Table L-1 summarizes the estimated reclamation costs for each affected area within the mine permit area. <br /> The reclamation cost components are summarized as follows: <br /> • May Day No. 1 Mine Site Reclamation-$26,002.00; <br /> • May Day No. 2 Mine Portal-$9,059.00; <br /> • Lamb Mine Rock Reclamation-$8,384.00;and <br /> • Idaho Mine Site Reclamation-$3,815.00. <br /> The total reclamation cost including indirect costs is estimated to be$47,260.00. <br /> May Day Idaho Mine Complex 112(d) <br /> December 29,2016 <br /> "Strategically Positioned—Technically Prepared" <br /> Phone:(303)832-7664 <br />
The URL can be used to link to this page
Your browser does not support the video tag.