My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-28_REPORT - M1983067
>
Day Forward
>
Report
>
Minerals
>
M1983067
>
2017-03-28_REPORT - M1983067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 2:14:48 PM
Creation date
3/29/2017 11:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983067
IBM Index Class Name
Report
Doc Date
3/28/2017
Doc Name
Annual Fee/Report/Map
From
Albert Frei & Sons Inc.
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> baekfilled: 7.88 seeded w/ 13.87 w/topsoil 13.87 mulched w/ NA <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: 46.58 fertilized w/ NA replacement 8" rate(tons/ac): NA <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application Drilled application NA application NA <br /> method: I method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES X(X <br /> If"YES", indicate the weed species,control area,control type,application rate and treatment date on the report map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? XXX XM N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? XXX XX N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br /> Engineer(Well Permit, S.W.S.P.,and/or Permanent Augmentation Plan)? XXX XX N/A <br /> 17. Are all hazardous materials stored within approved spill containment structures? XXX XX N/A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES XM XX <br /> 19. Is your basis for legal right to enter still valid? YES XX <br /> 20. Does your permit require you to submit monitoring information annually? YES XX XDA <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: yes <br /> See attached page for additional information <br />
The URL can be used to link to this page
Your browser does not support the video tag.