My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-28_HYDROLOGY - C1981012
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981012
>
2017-03-28_HYDROLOGY - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 4:01:56 PM
Creation date
3/29/2017 9:12:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
3/28/2017
Doc Name
Quarterly Sediment Pond Inspection Report
From
New Elk Coal Company, LLC
To
DRMS
Annual Report Year
2016
Report Quarter_Month
2
Permit Index Doc Type
Sediment Pond Inspections
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(15) <br />Mine: New Elk <br />NPDES ID. No.: None: Containment Area RDA -SW <br />Inspection Period: Second Quarter 2016 <br />Inspection Date: 06/20/16 <br />General Description or Reference to Site Plan: <br />This containment area lies west of the RDA refuse conveyor and south of Hwy. 12. It is designed <br />to contain run-off from this area of the RDA belt conveyor. Specifications are detailed on the <br />Containment Area RDA -SE As built drawing dated 4/24/93. The stage storage curve shows <br />top of embankment at 7415' with sediment accumulation to 7413.5'. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Excellent Moderate Few <br />Extensive Some Few <br />4). Erosion of the downstream toe of the embankment' <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />Yes <br />Yes <br />Poor <br />None <br />No r✓` <br />No Ll_� <br />Yes No <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? No <br />L, Yes <br />Elevation @ top of:�, %r, H T� �n �► ' /S - <br />Elevation of Water Surface: <br />Elevation to top of Sediment:F/ <br />OTHER OBSERVATIONS, <br />MSHA Qualified Impound ent Inspector <br />Professional Engineer Directing Inspe �, _ -_- <br />Date <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.