Laserfiche WebLink
Dozer Push Average <br /> Distance Distance + — <br /> A(FT) B(FT) (FT) JOB CONDITION CORRECTION FACTOR 't <br /> Pond 1 1 851 97 91 Operator Skill Above Average 0.900 Y �� <br /> Pond 2 1 551 75 65 Material consistency 1.100 r { + <br /> Pond 3 1 551 85 70 Dozing method slot 1.200 <br /> DOZER PUSH DISTANCE 75 Visibility 1.000 <br /> Job Efficiency(50 min/hr) 0.830 <br /> DESCRIPTION UNIT Spoil Pile 1.000 <br /> Material Quantity(Loose < % 6S 8 <br /> Volume) LCY 16,599 Push Gradient 1.225 - > P°r j { <br /> Average Push Distance <br /> (FT) FT 75 Altitude 1.000 <br /> Unadjusted Hourly �.� s <br /> Production LCY/HR 1,550 Material Weight 0.868 QonaZ- J. i 'It <br /> Net Correction Factor 1.0485 Blade Type(U Blade) 1.000 <br /> Adjusted Hourly + <br /> Production LCY/hr 1,625 NET CORRECTION 1.0485 .'{ <br /> • z <br /> Total Job Time hr 10.2 <br /> Fleet Cost per Hr $/hr $253.83 <br /> If <br /> TOTAL JOB COST $ $2,592.54 i <br /> a � <br /> NOTES <br /> Adjust push distance to reflect site conditions and correct"Unadusted hourly production". <br /> Adjust operator skill to reflect premium wage and adjust"Net Correction Factor". <br />