My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-23_REPORT - M1988112
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1988112
>
2017-03-23_REPORT - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2020 10:52:38 PM
Creation date
3/24/2017 12:04:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
REPORT
Doc Date
3/23/2017
Doc Name
Annual Fee/Report/Map
From
Battle Mountain Resources, Inc.
To
DRMS
Annual Report Year
2017
Email Name
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAM NAME: San Luis Taiiinit Dam DATE OF REPORT: 0612111 <br /> TAILING DAM INSPECTION FORM <br /> ITEMS REQUIRING ACTION BY OWNER TO IMPROVE THE SAFETY OF THE DAM <br /> MAINTENANCE • MINOR REPAIR ! MONITORING <br /> El(1)PROVIDE ADDITIONAL EROSION PROTECTION To improve right groin repair area erosion control <br /> ❑(2)CLEAR BRUSH FROM <br /> 0(3)INITIATE RODENT CONTROL PROGRAM AND PROPERLY BACKFILL EXISTING HOLES <br /> 0(4)GRADE CREST TO A UNIFORM ELEVATION WITH DRAINAGE TO THE UPSTREAM SIOPE <br /> 0(5)PROVIDE SURFACE DRAINAGE FOR <br /> ❑(6)MONITOR _ — <br /> ❑(7)OTHER- <br /> -.1(8)OTHER Implementation of South Diversion Ditch Improvements per recent(2015-16)design will improve flood protection <br /> 0(9)OTHER. <br /> ENGINEERING• EMPLOY AN ENGINEER EXPERIENCED IN DESIGN AND CONSTRUCTION OF DAMS TO: <br /> (Plans and specifications to be approved by CDRMS prior to construction.) <br /> ❑(10)PREPARE PLANS AND SPECIFICATIONS FOR REHABILITATION OF THE DAM _ <br /> 0(11)PREPARE AS BUILT DRAWINGS OF: !� <br /> 0(12)PERFORM A GEOTECHNICAL INVESTIGATION TO EVALUATE THE STABILITY OF THE DAM• <br /> ❑(131 PERFORM A HYDROLOGIC STUDY TO DETERMINE REQUIRED SIZE OF FLOOD BYPASS/SPILLWAY _ <br /> ❑(14)PREPARE PLANS AND SPECIFICATIONS FOR AN ADEQUATE SPILLWAY _ <br /> 0(15)SET UP OR IMPROVE MONITORING SYSTEM- <br /> 0(16)OTHER: Implementation of South Diversion Ditch Imorovements per recent(201S-16)design will improve flood protection <br /> 0(17)OTHER <br /> Recommended schedule for upgrades/implementation of recommendations(please prioritize and note importance of each): <br /> 1) Right groin erosion protection: modify contour berms and rock-lined downdrains to prevent short-circuiting <br /> 2)South Diversion Ditch Improvements per engineered plans and specifications prepared Dec 2015 <br /> Attachments:Piezometer readings,Photo log <br /> I'd Photographs 0 Attachments <br /> ENGINEER'S INSTRUCTION: Instructed owner on the safety concerns with the structure and how to monitor and inspect the dam and <br /> appurtenant works in the interim period between the regulatory annual Inspections. 0 Yes 0 No <br /> Comment <br /> Professional Engineer's Signature 4 -- ' t_ Date. 6/21/2016 <br /> Reviewed by <br /> Owner/Owner's Representative <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.