Laserfiche WebLink
QUARTERLY INSPECTION SUMMARY <br /> NAME OF DAM: an Luis Pro ect Tailing Dam ICO DRMS Permit#: 1988-112 <br /> REPORTING PERIOD:I&V lo%4,1 thru jv4 REPORT#-.I <br /> INSPECTION ITEMS PHOTOS <br /> Piezometer Levels <br /> Drain Collection and �t <br /> Pumpback System <br /> Observations <br /> SeepagetErosion <br /> Observations <br /> 0,vP.c" <br /> Vegetabon/Rodent/ <br /> Other Maintenance <br /> Observations <br /> Diversion System <br /> Observations <br /> REC MMENDATt NS/COMMENTS <br /> INSPECTION AND REPORTING PERSONNEL <br /> NAME REPRESENTING TITLE/ROLE <br /> r. �t <br /> 4,v k D CGS L ha e tM.o u k t A gNfauV G L- utn OL Gv <br />