My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-27_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2017-02-27_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2018 8:33:04 AM
Creation date
3/17/2017 8:18:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
2/27/2017
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />(2) Operation Description - Underground Mining <br />The proposed surface disturbance associated with the underground mining <br />activities within the permit area include; 1) haul roads; 2) access roads; 3) a <br />utility corridor; 4) benches for mine facilities; 5) a gob pile and 6) unit train <br />loadout. The area has previously been disturbed by the construction of <br />access roads for property management and mineral exploration and the long <br />term operation of the old King Mine. To the extent possible, the existing <br />access road corridors were integrated into the surface disturbance. <br />The proposed disturbed area is shown on the Mine Facilities Maps Nos. 15-1, <br />15-2, 15-3 and 15-4. The Mine Plan Maps No. 14 & 14-B present the <br />proposed underground development schedule. <br />1. Haul Roads <br />One haul road will enter the property from old State Highway 133. The traffic <br />on this road will flow one of two directions. The first will be access to the <br />mine facilities area which is located about 9,500 feet from the highway. This <br />road rises about 800 feet from the old State Highway. The second traffic <br />direction will be to the gob pile. This road will traverse to the east along a rail <br />road siding bench previously utilized by the old King Mine operation. The <br />gob pile is located east of the mine entrance below the old King Mine portals. <br />The second haul road will begin near the base of the coal preparation plant <br />and traverse south and east across Bowie Road (State Highway 1338) near <br />MM 13.2. The grade of the haul road will vary between 2% and 10% as it <br />declines in elevation from the preparation plant to Gob Pile number 3. <br />2. Access Roads <br />Access roads are to be constructed from the main haul road to the utility <br />corridor as shown on the Mine Facilities Maps 15-1 and 15-2. An access <br />road was also constructed from the portal bench to the utility bench. <br />PR -12 2.05-10- 02/10 <br />/90�140�C-,D <br />Il/�6/jp <br />
The URL can be used to link to this page
Your browser does not support the video tag.