Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Reclamation Cost for Exh. 13C <br />Site: Colowyo Coal Mine Permit Action: 13C <br />PROJECT IDENTIFICATION <br />Task M _ 000 State: Colorado <br />Date: 3/14/2017 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C019-000 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />009 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />016 <br />017 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />026 <br />027 <br />028 <br />Remove Collom Haul Road and Facility Culverts DEMOLISH <br />1 <br />1 <br />2 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />24.00 <br />$96,069.90 <br />$40,039.85 <br />$13,478.00 <br />$1,645,063.00 <br />$528,626.00 <br />$276,389.00 <br />$78,455.00 <br />$828,558.00 <br />$167,021.00 <br />$6,930.00 <br />$2,584.00 <br />$4,158.00 <br />$6,319.00 <br />$12,031.00 <br />$33,109.00 <br />$2,451.00 <br />$8,192.00 <br />$2,921.00 <br />$279.00 <br />$875.00 <br />$1,005.00 <br />$719.00 <br />$455.00 <br />$1,271.00 <br />$3,044.00 <br />$6,641.00 <br />$73,455.00 <br />Demo Collom Facilities DEMOLISH <br />60.00 <br />Rip 29,458' of Collom Haul Road RIPPER <br />12.69 <br />Haul Spoil to Collom Haul Road SCRAPERI <br />569.57 <br />Re rade Collom Haul Road DOZER <br />279.01 <br />Haul Topsoil to Collom Haul Road SCRAPER]- <br />99.64 <br />Re rade Topsoil for Collom Haul Road DOZER <br />41.41 <br />Re rade Collom Facility Area DOZER <br />437.31 <br />Re rade Topsoil at Collom Facility Area DOZER <br />88.15 <br />Section 25 Pond Removal DOZER <br />30.18 <br />Middle Pond Removal DOZER <br />11.25 <br />Section 36 Pond Removal DOZER <br />18.11 <br />Section 26 Pond Removal DOZER <br />27.52 <br />Sidehill Pond Removal DOZER <br />52.38 <br />Coal Stockpile Pond Removal DOZER <br />144.16 <br />Temporary Facilities Pond Removal DOZER <br />10.67 <br />Wilson Storage Pond Removal DOZER <br />35.67 <br />Re rade ditch D1 Upper (00-57+74) DOZER <br />15.23 <br />Re rade ditch D1 Lower (00-6+23) DOZER <br />1.46 <br />Re rade ditch D2 DOZER <br />4.56 <br />Re rade ditch D3 DOZER <br />5.85 <br />Re rade ditch D4 DOZER <br />4.18 <br />Re rade ditch D5 DOZER <br />2.65 <br />Re rade Topsoil for Ditch D1 through 5 DOZER <br />7.39 <br />Remove and dispose of Rip rap from ditches, D1, TRUCKI <br />D2, D3, D4 <br />5.76 <br />Re rade Topsoil for Raw Water Line DOZER <br />14.02 <br />Reseed All Disturbance Associated with Exh. 13C REVEGE <br />133.00 <br />SUBTOTALS: <br />2135.82 <br />$3,840,139 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Performance bond: 1.05 <br />Job superintendent: 1,064.99 <br />Total = $77,570.81 <br />Total = $40,321.46 <br />Total = $77,797.52 <br />