Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 023 Page 1 of 2 <br />Task description: <br />Site: Colowyo Coal Mine <br />BULLDOZER WORK <br />__Regrade ditch D4 <br />Permit Action: 13C <br />PROJECT IDENTIFICATION <br />Task #: 023 State, Colorado <br />Date: 3115!2017 County. Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8_T_ - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per der <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Utilization % <br />$83.81 NA <br />$46.32 70 <br />l $0.00 NA <br />$0.00 0 <br />$41.85 NA <br />$17_1.97 <br />$171.97 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,726 <br />Swell factor: 1.000 <br />Loose volume: 2,726 LCY <br />Source of estimated volume: Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B-1 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 1,400.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />-20% <br />7,500 feet <br />Ibs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 AVG. <br />Material consistency: 0.900 CAT HB <br />Dozing method: 1.200 (S -BY -4 <br />Visibility: 1.000 AVG. <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: CO 19-023 <br />