Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 020 Page 2 of 2 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient. <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.868 <br />Blade type: <br />1.000 <br />Net correction: 0.3112 <br />Adjusted unit production: 435.68 LCYIhr <br />Adjusted fleet production: 435.68 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(§)_ <br />Unit cost: $0.4401LCY <br />Total job time: 1.46 Hours <br />Total job cost: $279 ___ <br />1 SHIFT/DA <br />(FND-RF) <br />(CAT HB) <br />:AT HB <br />;AT HB <br />(PAT) <br />