Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 016 Page I of 2 <br />BULLDOZER WORK <br />Task description: Coal Stockpile Pond Removal <br />Site: Colowyo Coal Mine Permit Action: 13C <br />PROJECT IDENTIFICATION <br />Task #: 016 State: Colorado <br />Date: 3/I5/2017 County: Moffat <br />User: ZTT <br />Agency or organization name: . DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Slade Type: <br />Semi -Universal _ <br />Attachment: <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. Cost/Hour: <br />Ripper op. CostlHour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $229.67 <br />Total Fleet Cost/Hour: $229.67 <br />Utilization % <br />$100.59 <br />NA <br />$87.23 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Penmit/Job#: C1981019 <br />Abbreviation: None <br />Filename: CO 19-016 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />61,301 <br />Swell factor: <br />1.000 <br />Loose volume: <br />61,301 LCY <br />Source of estimated volume: Exh 7,Item 23,Fig. C5 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />120 feet <br />1,093.1 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 6,900 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />0.900 <br />CAT HB <br />Dozing method: <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />AVG. <br />