Laserfiche WebLink
Bulldozer Worksheet Cont'd <br />Task # 014 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.868 <br />BIade type: <br />1.000 <br />Net correction: 0.3890 <br />Adjusted unit production: 425.22 LCYIhr <br />Adjusted fleet production: 425.22 LCYIhr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.540/LCY <br />Total job time: 27.52 Hours <br />Total job cost: $6,319 <br />(1 SHIFTIDAY) <br />(CAT HB) <br />(CAT HB) <br />'AT HI <br />(PAT) <br />Page 2 of 2 <br />