Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 010 Page l of 2 <br />BULLDOZER WORK <br />Task description: Regrade Topsoil at Collom Facility Area <br />Site: Colowyo Coal Mine Permit Action: 13C Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: <br />010 <br />Date: <br />3115/2017 <br />User: <br />ZTT <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IT -IIU <br />- <br />Horsepower: <br />.................. ....... <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$473.67 <br />$1,894.66 <br />$226.13 <br />183.90 <br />$21.79 <br />Utilization % <br />NA <br />100 <br />NA <br />$41.85 1 NA <br />MATERIAL QUANTITIES <br />Initial Volume: 247,278 <br />Swell factor: 1.250 <br />Loose volume: 309,098 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated sweII factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />25% <br />7,600 feet <br />2,650 Ibs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Abbreviation: None <br />Filename: C019-010 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />.AVG.} <br />Material consistency:_ <br />1.200 <br />CAT HB <br />Dozing method: <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />_(AVG.) <br />