My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-16_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2017-03-16_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 10:58:30 AM
Creation date
3/16/2017 10:43:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/16/2017
Doc Name
Adequacy Review #2
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR110
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 006 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: 0.80 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 7500 feet <br />Seg # Haul Distance (Ft) Grade Roll. Res <br />Scraper <br />Push Dozer Source <br />Altitude Ad': <br />1.000 <br />NA CAT HB <br />Job Efficiency: <br />0.830 <br />NA CAT HB <br />1.20 <br />-1.55 2972 <br />0.72 <br />Net Correction: <br />0.830 <br />NA <br />Travel Time: <br />Adjusted single scraper team (unit) hourly production: <br />911.17 _ <br />Road Condition: <br />Very hard, smooth, asphalt or concrete, no tire penetration 1.2 <br />Haul Rnute: <br />LCY/Hour <br />Unadjusted unit production/hour: <br />Seg # Haul Distance (Ft) Grade Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 2000.00 2.75 1.20 <br />3.95 <br />2394 <br />1.05 <br />Haul Time: 1.05 minutes <br />Return Rnute.- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res Velocity (fpm) <br />Travel Time <br />(min) <br />1 J <br />2000.00 <br />-2.75 <br />1.20 <br />-1.55 2972 <br />0.72 <br />CIRCES Cost Estimating software <br />Return Time: <br />0.72 <br />minutes <br />Total Scraper team cycle time: <br />3.17 <br />minutes <br />Adjusted for job conditions: <br />455.58 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />911.17 _ <br />_ LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />3,644.67 <br />LCY/Hour <br />Unadjusted unit production/hour: <br />548.90 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) <br />Total job time: <br />99.64 <br />Hours <br />Unit cost: $0.761 /LCY <br />Total job cost: <br />$276,389 <br />CIRCES Cost Estimating software <br />
The URL can be used to link to this page
Your browser does not support the video tag.