My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-16_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2017-03-16_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 10:58:30 AM
Creation date
3/16/2017 10:43:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/16/2017
Doc Name
Adequacy Review #2
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR110
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 005 Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Regrade Collom Haul Road <br />Site: Colowyo Coal Mine Permit Action. 13C Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: <br />005 <br />Date: <br />3/15/2017 <br />User: <br />ZTT <br />State: Colorado <br />County: Moffat <br />Agency or organization name: _ DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IT - I IU <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $473.67 <br />Total Fleet Cost/Hour: $1,894.66 <br />Utilization % <br />$226.13 NA <br />$183.90 100 <br />$21.79 NA <br />$0.00 0 <br />$41.85 1 NA <br />Abbreviation: _ _ None <br />Filename: C019-005 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />1,116,301 <br />Swell factor: <br />1.250 <br />Loose volume: <br />1,395,376 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Dry, non -cohesive 0.8 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />7,600 feet <br />2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />AB.AVG. <br />Material consistency: <br />0.800 <br />CAT HB <br />Dozing method: <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />AVG. <br />
The URL can be used to link to this page
Your browser does not support the video tag.