Laserfiche WebLink
o� Cow <br />:^ t COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />• 1876 •" 1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866-3567 <br />REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />M-1987-13 Penrose Pit MAR 15 2017 <br />File No.: M- Site Name - <br />County <br />Fremont <br />MINING & SA �yVGN <br />TR# (DRMS Use onrvl " <br />Permittee: Fremont Paving & Redi Mix, Inc. <br />Operator (If Other than Permittee): <br />Permittee Representative: J O h n Paul Ary <br />TR03 <br />✓ Complied! <br />✓0 Violations: <br />Please provide a brief description of the proposed revision: <br />Fremont Paving and Redi Mix would like to submit a Weed Management Plan for the <br />Penrose Pit. The plan is attached for review. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - PIease mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Tvae Re uired TR Fee Submitted (mark only one) <br />I IOc, 111, 112 construction <br />materials, and 112 quarries $216 ✓ <br />112 hard rock (not DMO) $175 ❑ <br />1 IOd, I 12d(1, 2 or 3) $1006 ❑ <br />