My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-15_REPORT - C2010089 (4)
DRMS
>
Day Forward
>
Report
>
Coal
>
C2010089
>
2017-03-15_REPORT - C2010089 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2017 11:40:48 AM
Creation date
3/15/2017 10:28:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Report
Doc Date
3/15/2017
Doc Name
Annual Reclamation Report
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Annual Report Year
2016
Permit Index Doc Type
Annual Reclamation Report
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Horizon North Mine <br />Figure 1 - CDRMS Annual Reclamation Report Form <br />Colorado Division of Reclamation Mining & Safety Standardized Report Form <br />Annual Reclamation Report for the Year <br />2016 <br />New Horizon North Mine C-2010-089 Elk Ridge Mining and Reclamation, LLC. <br />Mine name permit # Permittee <br />Address: P.O. Box 628 / 27646 W. 5 1 St Nucla, CO 81424 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon by the <br />Division. It should include text, discussion, and maps, at a minimum, in addition to any other reclamation monitoring <br />data as required by the approved permit. The location of the acreage reported under each land status category and <br />year of seeding (if applicable) should be clearly and accurately identified on a map included with the report. <br />Land Status Category <br />Last Years Cumulative <br />Total <br />This Calendar Year <br />Cumulative Total' <br />Acres disturbed <br />148.2 <br />6.2 <br />154.4 <br />Acres backfilled and graded <br />44.0 <br />16.8 <br />60.8 <br />Acres topsoiled <br />23.4 <br />6.4 <br />29.8 <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for each category <br />below. Do not include acres that have achieved final, Phase III release. <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 154.4 and the total number of acres: <br />Phase I released 0 Phase II released 0 Phase III released 0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed NA <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 44.8 <br />Acreage in active mining areas 3 58.2 <br />'(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of -hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />2016 Annual Reclamation Report Page 6 <br />Last Years <br />This Calendar <br />Cumulative <br />10 years <br />Greater than <br />Cumulative Total <br />year <br />Total' <br />or less <br />10 years <br />Acres seeded* <br />0 <br />8.2 <br />8.2 <br />0 <br />0 <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 154.4 and the total number of acres: <br />Phase I released 0 Phase II released 0 Phase III released 0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed NA <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 44.8 <br />Acreage in active mining areas 3 58.2 <br />'(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of -hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />2016 Annual Reclamation Report Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.