My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-14_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2017-03-14_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2020 6:27:32 AM
Creation date
3/15/2017 8:32:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
3/14/2017
Doc Name
Monitoring and Site Activities Summary
From
Battle Mountain Resources, Inc.
To
DRMS
Email Name
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br /> March 08,2017 <br /> RECEIVED <br /> MAR 14 2017 <br /> Mr. Wally Erickson DMSION OF REW. MATION <br /> State of Colorado MINING&SAFETY <br /> Division of Reclamation,Mining and Safety <br /> 1313 Sherman Street,Room 215 <br /> Denver,CO 80203 <br /> Re: Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112 <br /> February 2017 Monthly Report <br /> Dear Mr.Erickson: <br /> The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br /> San Luis Project for the month of February 2107. <br /> Surface and ground water monitoring and analysis were completed for all required sites during the month <br /> per the terms and conditions of the TR 32 Quality Assurance and Quality Control(QA/QC)plan. <br /> Vacuum on the tailing lysimeters was verified on February 28 h, no water was present for sampling and <br /> subsequent analysis. <br /> Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br /> Pit monitoring wells on February 28t`. The February tailing impoundment piezometer measurements <br /> identified these installations were either dry or contained less than 12 inches of water as illustrated in <br /> Table 2. Tables 1 and 2 below identify the depth to water measurements collected for each of the site <br /> monitoring wells, piezometers and lysimeters as required by the terms and conditions of the TR-32 <br /> QA/QC plan. <br /> The leak detection system was measured on February 28 h.A total of 960 gallons of water was excavated <br /> from the leak detection system yielding a monthly average of 34.2 gpad.The tailings pond under-drain <br /> measured 38.5 gpm. <br /> During the month of February,the West Pit water treatment plant operated efficiently discharging a total <br /> of 7,325,400 gallons(22.48 acre-feet)of water to Rito Seco Creek and a total of 587,800 gallons(1.80 <br /> acre-feet)of water was transferred from the West Pit to the tailings impoundment. Seepage along Rito <br /> Seco Creek remained dry during the month. <br /> P.O.Box 310 - San Luis,Colorado 81152-0310 - (719)379-0798 - Fax(719)379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.